This project involves the replacement of underground water mains, canal water and domestic water, between Outer Circle Dr. and Rock Rd. along the e…
Subcontractor will perform roof repairs on Building 218-1H utilizing a Hydro-Stop system which includes foundation, fabric, and a final coat.…
Repair, resurface, and repaint the EIFS. …
Construction personnel will renovate the interior of Building 701-1H.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Curecanti-Crysta…
Remove the end of life asphalt roof shingles, overlay existing wood deck, and install new 35-year asphalt shingles.…
Western Area Power Administration (WAPA) Desert Southwest Region (DSW) proposes to conduct maintenance along the Harcuvar-Little Harquahala and Har…
Re-caulk windows at the southeast and northeast corners of 730-B.…
Remove designated areas of crusher run and replace with asphalt.…
Site construction will clean the floor at Building 731-6N of bird droppings using a clorox bleach solution.…