Evaluate and repair crane solenoid and breaker that is intermittenly tripping on low lift crane at 681-3G.…
Replace Valves SCW-V-4501 and 4500 at K-Area Assembly Area, and associated insulation.…
The Bonneville Power Administration (BPA) is proposing to replace insulators, improve/reconstruct access roads, and install fall protection along t…
C. E. Bourne Subcontractor 00000611 will provide roof replacement at 766-H.…
Prep and paint the 614-20G A Area WIND tower and the 614-21G D Area WIND tower.…
Replace existing GFCI circuit breakers number 38 and number 40 in 701-20G…
Repair platform at PB-3 stream sample station platform.…
Renovations and modifications in building 711-1N.v…
731-1N Restroom Renovations.…
Demolish and replace the existing fence by Building 25.…