MSA/HMIS to perform routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (including, but…
730-4B Touch up paint and replace cove base for Rooms 135A, 135B, and 134.…
703-43A Remove/replace carpet.…
The Kesselring Site Head Tanks Corrosion Protection Project includes work to Head Tanks (27A and 27B) for repairs to the interior iron oxide uretha…
LM propses to transition the long-term care and custody of the Split Rock, Wyoming, Disposal Site from Western Nuclear Incorporated (WNI) to LM.…
Argonne's scientific advancements require a strong foundation that supports reliable, redundant, maintainable, and flexible utility systems, as thi…
Perform repairs to the interior of Building 706-N.…
Remove and replace floor covering in 704-K Maintenance Lunch Room.…
784-7A Correct/replace metering bin gear box seals.…
Subcontractor will provide roof replacement at 735-A.…