Road E (2.5 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …
Bonneville Power Administration (BPA) proposes to remove a 7-foot-tall chain-link fence surrounding the Bell Substation and Maintenance Headquarter…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its tandem Alcova-Ca…
Re-Insulate 931- condensate tank and associated piping.…
Replace damaged and loose carpet with carpet squares to match carpet previously replaced in other areas of the building on all three floors.…
Remove and replace floor material and ceiling tile in specific rooms in 701-1L.…
Replace carpet in IT Area in 730-4B 1st Floor.…
Replace steps and decking at 235-11F.…
Install WI-FI in 730-2B Room 204.…