CX-024443: Olympia-Grand Coulee No. 1 Phase IV Insulator Replacement

BPA proposes to replace insulators and install fall protection along the Olympia-Grand Coulee No. 1 287 kV transmission line from miles 24 through …

Office of NEPA Policy and Compliance

August 30, 2021
Estimated Read Time   min

BPA proposes to replace insulators and install fall protection along the Olympia-Grand Coulee No. 1 287 kV transmission line from miles 24 through 70, along with insulators and fall protection at two dead-end structures at the Olympia Substation.