This PLC is obsolete and needs replacement. The existing GS PLC and two remote I/O drops (2 and 3) require upgrading to the latest Emerson DeltaV c…
Office of NEPA Policy and Compliance
June 9, 2021This PLC is obsolete and needs replacement. The existing GS PLC and two remote I/O drops (2 and 3) require upgrading to the latest Emerson DeltaV control system hardware/software to implement SRTE’s ongoing strategy to standardize and integrate process control using the Emerson DeltaV platform.