CX-023376: Urgent: Martin Creek – Drain 9/4 Wood Pole Replacement

BPA proposes to perform in-kind replacement of wood pole structure 9/4 and associated structural/electrical components (e.g., cross arms, insulator…

Office of NEPA Policy and Compliance

March 31, 2021
Estimated Read Time   min

BPA proposes to perform in-kind replacement of wood pole structure 9/4 and associated structural/electrical components (e.g., cross arms, insulators, guy anchors, etc.) on the Martin Creek – Drain No. 1 line due to damage at the base of the pole.