Glen Canyon Substation Emergency Erosion and Waterline Repairs CX(s) Applied: B1.3Date: 05/18/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Concertina Wire Installation at Liberty Substation CX(s) Applied: B1.11Date: 04/21/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Mead-Phoenix Spacer Damper Repair on One Structure CX(s) Applied: B1.3Date: 04/20/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Electrical District No. 5 Erosion Protection CX(s) Applied: B1.3Date: 04/20/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Pinnacle Peak Substation Tree and Shrub Removal CX(s) Applied: B1.3Date: 04/01/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Tucson Substation Rebuild, Stage 02 CX(s) Applied: B4.11Date: 03/30/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Pinnacle Peak-Rogers 230 Kilovolt Transmission Line Inset Structure 5/1A CX(s) Applied: B4.6Date: 03/23/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Atmospheric CO2 Capture and Membrane Delivery Award Number: DE-EE0007093 CX(s) Applied: A9, B3.6, B3.11 Bioenergy Technology Office Date: 03/10/2016 Location(s): AZ Office(s): Golden Field Office
Glen Canyon Navajo and Navajo Long House Valley 230 Kilovolt Transmission Line Access Road Maintenance Conino County CX(s) Applied: B1.3Date: 03/04/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Rocky Mountain Region
Mead-Liberty and Mead-Perkins Vegetation Management, Route 66 to Interstate 40 CX(s) Applied: B1.3Date: 02/25/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region