Lone Butte Substation Erosion Repairs CX(s) Applied: B1.3Date: 09/22/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Atmospheric CO2 Capture and Membrane Delivery Award Number: DE-EE0007093 CX(s) Applied: A9 Bioenergy Technologies Office Date: 09/21/2015 Location(s): Arizona Office(s): Golden Field Office
Dome-Wellton-Mohawk-Ligurta Line Maintenance CX(s) Applied: B1.3Date: 09/14/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Efficiency enhancement in c-Si solar cells by introducing fixed-charge into SiNx passivation film using a novel low-cost plasma changing method Award Number: DE-EE0007189 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Date: 09/10/201...
Herbicide Application at Mexico Tap CX(s) Applied: B1.3Date: 08/11/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
MFIX-DEM Phi: Performance and Capability Improvements Towards Industrial Grade Open-source DEM Framework with Integrated Uncertainty Quantification CX(s) Applied: A9Date: 08/04/2015 Location(s): ArizonaOffices(s): National Energy Technology Laboratory
Verification of Capillary Pressure Functions and Relative Permeability Equation CX(s) Applied: A9, B3.6Date: 07/21/2015 Location(s): ArizonaOffices(s): National Energy Technology Laboratory
Sonora Substation Antenna Pole Addition CX(s) Applied: B1.19Date: 07/20/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Gila Substation Stage 07 Rebuild Project and Related Communications Equipment Replacement CX(s) Applied: B4.11Date: 07/20/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Dome Tap-Wellton Mohawk Ligurta - Replace Structure CX(s) Applied: B1.3Date: 07/01/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region