The Idaho National Laboratory (INL) will collaborate with Lawrence Livermore National Laboratory (LLNL) to support the design and execution of an e…
This ECP revision is based on Oklo requesting to spread soil in two areas as needed. There are two locations identified, On site and Medal of Honor…
Re-string overhead conductor in Sioux Falls Area. Upgrading to AAAC for minimum 193Su/264Wi MVA line rating.…
Re-string overhead conductor from WAPA Granite Falls Substation to Marshall Substation. Upgrading from 477 ACSR to AAAC.…
Re-string overhead conductor from Lake County Substation to Lakeview Substation. Upgrading from 4/0 ACSR to AAAC.…
The project involves replacement of a 1954-era substation transformer at the East Bristol Substation with a modern high-efficiency transformer. No …
Subrecipient proposes to purchase and interconnect a commercially available 9.1 MW, 36.4 MW-hr. battery energy storage system (BESS) within its ser…
Remove old valve pit cover and install new concrete cover at 901-G H-10 valve pit.…
713-1N Replace east personnel door, threshold and emergency door rim device due to normal wear and tear and replace personnel door/awning located o…
Remove HVAC pad and add parking space at 731-N.…