This Programmatic NEPA CX will cover all activities under Substation Stabilization Priority Projects, Repairs to Transmission Facilities, Priority …
Overhead to underground conversion of approximately 6 miles of power lines. …
New 3-phase underground power line (approx. 0.5 mile), a new cable installed by boring under the Pen Oreille River (approx. 0.25 mile), and the reb…
Prep and apply Cool Seal to roll-up doors 1 and 2 at 705-C.…
Generators for use greater than 12 months to be added as insignificant activities.…
At the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU), one existing monitoring well (CMP 50B) has been determined to be compromise…
Maintenance will replace the packing material in the M-1 Air Stripper Column.…
Evaluate, correct, and overhaul chiller No. 2 and return to normal working conditions in HB-Line.…
Storm drain piping in 105-L will be replaced.…
Reactor slugs and surrogate materials will be dissolved and tested in SRNL for off gas testing. Solution preparation and mock-up testing will be co…