BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g., cross arms, insulators, guy ancho…
The Bonneville Power Administration (BPA) is proposing the replacement of structure 3/4 on the Forest Grove-Tillamook No 1 transmission line. The r…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Coppin State University (CSU) to advance renewable energy technologi…
The Advanced Scale Up Reactor Experiment (ASURE) facility factors heavily in the National Energy Technology Laboratory's (NETL) Gasification Multi-…
The project involves replacement of approximately 16.4 miles of existing 2/0 ACSR and No. 2 ACSR electric distribution lines with upgraded 336 ACSR…
Remove and replace 234 aging existing distribution structures, including poles, crossarms, and insulators, with new components designed to meet mod…
ROW and easement clearance will take place approximately 12 miles from the Lovell Canyon turn off. This will consist of road construction and clear…
To remove old power lines on wooden poles running through a heavily vegetated, fire-prone area and reroute them away from wildfire zones onto four …
Replacing existing aging pole structures with new pole structures.…
An existing 10 MVA station transformer will be replaced with a larger capacity transformer inside of an existing substation. An automated circuit b…