The project will upgrade a single-phase line to a three phase line within an existing ROW. …
Replace posts and cables that span Lower Three Runs, Steel Creek and Four Mile creek bed. These cables support the flow tracking device used to mea…
C. E. Bourne Subcontractor 00000611 will provide roof repairs at 704-22G. The subcontractor will not disturb the existing roof while performing the…
An unknown well on the eastern side of K Area is within the proposed area of a new additional parking lot and is inhibiting construction for the pa…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
LM is proposing to conduct Phases II and III of the Disposal Cell Cover Enhancement Pilot Project at the Rifle Disposal site to address the potenti…
REPLACE 3836 RF METERS WITH AMI METERS. Install one 100' tower and base station.…
REPLACE 2909 RF METERS WITH AMI METERS. Install seven 100' towers and base stations.…
East River Electric Power Cooperative (ERC) is upgrading the Arlington Tap facility on the WAPA Watertown - Brookings 115 kV transmission line. WAP…
WAPA would acquire additional land around Wessington Springs Substation to mitigate erosion from the substation and minimize damages from neighbori…