The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
Operation and maintenance of the LECO Carbon/Sulfur. This method determines the concentration of carbon/sulfur in small lab samples.…
Installation of mesh pole wraps to mitigate wildfires. …
Vegetation management within Right-of-Ways. Thirty miles of copper conductor replacement. Replacement of electric poles. …
Replacement of approximately 90 wooden power poles with steel poles. Pole top covers are to be installed at various locations along with vegetation…
Venting gas cylinder bottles for the disposal of lecture bottles thru recycling in A-Area hoods.…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (NPT) to plant riparian vegetation along Little Salmon Creek in the Litt…
The American Electric Power's (AEP's) Buckrun Switch to West Crawford 69 kV Transmission Line Rebuild Project will rebuild approximately 6.12 miles of existing linear transmission line infrastructure generally within its existing 60-foot-wide right-of-way (ROW) between the existing Blanchard Station and West Crawford Station (main line) and between the main line and South Vanlue Station, in Hancock and Wyandot counties, Ohio.
Funding will support the project team's small-scale research and development of smart screens that can automatically control fluid flow in enhanced geothermal systems (EGS) based on temperature by overcoming the challenges of premature thermal breakthrough and non-uniform heat extraction by enabling autonomous, temperature-based flow control without complex electronics or chemical treatments.
Funding will support the project team's small-scale research and development of gaseous optical elements technology for the purpose of manipulating high-power lasers for future laser-driven nuclear fusion power plants.