Subrecipient proposes to purchase and interconnect a commercially available 9.1 MW, 36.4 MW-hr. battery energy storage system (BESS) within its ser…
Remove old valve pit cover and install new concrete cover at 901-G H-10 valve pit.…
713-1N Replace east personnel door, threshold and emergency door rim device due to normal wear and tear and replace personnel door/awning located o…
Remove HVAC pad and add parking space at 731-N.…
Rev. 1 - Change activity end date. This revision is for the collection of additional soil samples to further the characterization of the vertical d…
This project is a revision to the original environmental review process (ERP) identification 4157 that was covered by tent Environmental Compliance…
The Idaho National Laboratory (INL) is partnering with the U.S. Army Combat Capabilities Development Command (DEVCOM) and the Colorado School of Mi…
As part of Revision 1 to ECP INL-25-027, additional scope has been identified to support reactor demonstration at MFC-793. These activities are nec…
The purpose of this work is to install a cooling tower water treatment system at the Central Utility Building (CUB) that will not use any hazardous…
CX-035170: CPCCo Annual Categorical Exclusion - B6.1 Cleanup Actions, December 2025 to December 2026
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform small-scale, short-term cleanup actions, under RCRA, Atomic Energy Act, or o…