Categorical Exclusion (CX) Determinations By Date

R and D for the development of ceramic and halides based crystal growth samples. The crystals grown in this lab will be using chemical vapor transp…
Cove Point LNG, LP filed an application with DOE's Hydrocarbons and Geothermal Energy Office on March 16, 2026, seeking blanket authorization to engage in short-term exports of liquefied natural gas (LNG) previously imported into the United States from foreign sources.
The scope of the Bettis Atomic Power Laboratory North Campus Utility Corridor Project is to support the existing Fire Water and City Water utility services to the North Campus area, which are currently supplied by a looped system that provides redundant service from two directions in the event of a localized system failure.