Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
CARPE DIEM project is to deploy distribution level power flow controllers to a large utility at scale, and to incorporate this technology into thei…
The Supplier shall provide all materials, tools, equipment, supplies, transportation facilities, labor, supervision, and services required to deliv…
Purify solutions of dissolved actinides using ion exchange, valence adjustment, precipitation, filtration, and calcination.…
Front-End Engineering Design (FEED) Study for a Post-Combustion Carbon Capture (PCCC) system at Calpine's Pastoria Energy Facility (PEF) in Lebec, …
1. Install battery energy storage (BESS) units along distribution feeders. 2. Demolish retired 4kV substation property 3. Install substation equipm…
The work involves the installation of approximately 5,400 LF of conduits encased in concrete, 9 manholes, 9 padmount transformers and 2 pad mounted…
Clean and repaint the service bridge at 686-G, Steel Creek Dam.…
This activity is to provide high sensitivity analyses of samples from on and off site locations. These analyses are in support of site characteriza…
Pilot-scale deployment of olivine onto agricultural fields in central Mississippi for CO2 removal from the atmosphere through an Enhanced Rock Weat…