New stretch wrap machines will be installed at the 731-N Complex.…
Remove and abate mastic tile floor and refinish concrete in 284-10F.…
This EEC will cover the laboratory preparation and analysis (within the analytical services shared lab) for environmental samples from multiple res…
This experiment is being conducted to assess temperatures, pressures, and materials proposed for trapping zinc in the tritium facilities. Revision …
E-Area Maintenance to Paint the 110 Gallon Drums Needed For Upcoming Work.…
Bonneville Power Administration (BPA) is proposing to replace multiple deteriorating wood pole structures and associated hardware at specific locat…
This document covers the support activities of equipment rental, purchase of materials, and services under SSP supervision for oil caverns and brin…
The American Electric Power's (AEP) Philo to Ohio Central Install Transmission Line Rebuild Project will rebuild approximately 17.9 miles of existing linear transmission line infrastructure within its existing 100-foot-wide right-of-way (ROW) between the existing Philo Station and Ohio Central Station, in Muskingum County, Ohio.
The Geary County Infrastructure Upgrade Project will be used to upgrade 16 miles of copper weld electric distribution lines in rural Geary County, …
The proposed project entails the deployment of an ocean buoy containing a wave energy converter (WEC) prototype for field trails on an existing per…