Bonneville Power Administration (BPA) proposes to maintain the existing access road network between line miles 1 and 14, and between line miles 30 …
Install a Battery Energy Storage System (BESS) and smart distribution reclosers on the PGE Oxford-Rural distribution system.…
The proposed action includes Information Gathering, Analysis, and Dissemination, and the performance of geotechnical investigation and percolation …
LPO is considering whether to issue a loan guarantee of a funding facility to the Georgia Power Company (GPC) pursuant to its authority under the EIR Program.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the town of Natick for the installation of an air-cooled electric he…
Bonneville Power Administration (BPA) is proposing to replace two deteriorating wood pole structures and any associated hardware and guys at a loca…
The Bonneville Power Administration (BPA) proposes to repair fiber cable on the Grizzly – Captain Jack No. 1 transmission line between structures 1…
This Idaho National Laboratory (INL) project involves the collaboration with Radiant Industries, Inc. (Radiant). Radiant is currently working towar…
This Amended Determination follows the approval of additional project performers, project locations, and new retrofitting construction to finalize the development of a scalable manufacturing process for high-entropy alloy (HEA) catalysts for ammonia oxidation with enhanced catalytic activity, selectivity, and stability.
Replace 32 poles, transfer 59 poles, replace 11,000' of OH 336 spacer with 477 spacer cable, replace 8,100' of 3-500 13.8KV cable with 3-700 15KV, …