Subcontractor shall provide all labor, tools, equipment, materials, services, transportation, storage, and supervision required to replace the WHT-…
The U.S. Department of Energy (DOE) is proposing to provide Congressionally Directed Spending to the Grand Traverse Regional Land Conservancy (GTRLC) for the installation of a 1.15 megawatt battery energy storage system (BESS) at the GTRLC Headquarters in Traverse City, Michigan.
Overhead to underground conversion for approximately 4 miles of powerline. …
Project will develop, deploy, and demonstrate an advanced solid-state transformer system for a water pumping application.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of New Hampshire (UNH) for the design, fabrication, and testing of ultra-high-performance concrete (UHPC) for use in wave energy converter hulls.
Planned activities include the construction of a new 24-inch steel natural gas pipeline spanning approximately 3.75 miles along the existing PREPA …
Installation of battery energy storage systems of various sizes at five sites: Site 1 - Ooltewah, TN, Site 2 - Signal Mountain, TN, Site 3 - River …
This revision is for Oklo to install temporary power lines to the Aurora-INL project site, install a production well at the Aurora-INL site, and utilize an MFC construction water supply source to provide water to support Aurora-INL limited construction activities.
The proposed project includes the construction of five 138 kilovolt (KV) transmission lines totaling 3.5 miles of new 100-foot right-of-way (ROW) and the rebuilding of approximately 0.4-mile of existing 100-foot 138 kV transmission line ROW.
The Project will rebuild approximately 24.7 miles of existing linear transmission line infrastructure generally within its existing 100-foot-wide right-of-way (ROW) between the existing Duncan Substation and Cox City Road, in Grady and Stephens counties, Oklahoma.