Install bird control netting/clean up and seal floor drains at Receiving Basin for Offsite Fuel (RBOF).…
This EEC addresses planned renovation activities within 704-L.…
Evaluate and Correct 13.8KV Breaker Fault In Cubicle S2-14 at 151-2C.…
Removal of carpool shack (54-17 G) in AM and DO parking lot in N-Area.…
713-N Replace exterior door No. 7.…
Installation of UW Drops 704-1N Rm. 180.…
Installation of UW Drops 704-1N Rm. 117…
UPC sub-contractor to remediate asbestos before demolishing and removing (2) unused Handi-Houses to the C and D Landfill from the HY1 Laydown Yard.…
A 20 foot sealand/conex will be relocated from K-Area to SRPPF for use as a universal waste storage area.…
Subcontractor will provide roof repairs at 776-1A.…