Support for the Salt Waste Processing Facility (SWPF)…
Convert Room B-070 in 773-A into a Vault-type Room (VTR). Connect the VTR to the existing 773-A ARGUS node.…
Collection and analyses of environmental samples. Rev.1 - extends the activity end date.…
The goal of this work is to produce novel materials using the ball milling method of alloying under different gaseous atmospheres. Revision 1: Thi…
The proposed project is a 5MW/20MWh battery energy storage system (BESS), the construction of which includes minor grading, shallow foundations, an…
This Fourth Amended Determination follows the approval of additional funding, extended period of performance, a new project team member, and additi…
Building 263-241F is currently an open storage facility originally constructed to support the Waste Solidification Building (WSB) storage requireme…
The PA is a redesign of the existing Glovebox Stripper blowers under MT-TRI-2021-00017 Rev. 2. It redesigns the existing Glovebox Stripper blowers …
238-H is in the process of being decommissioned. Auxiliary plant lines need to be cut and capped to be decommissioned.…
This EEC is a revision of a previous EEC. [OBU-H-2020-0116] This revision updates the previous prefix to SRTE. - Provide seismically qualified SC F…