GPC proposes expansion of the existing Anthony Shoals substation and the installation of a new Status Synchronous Compensator (STATCOM) at the exis…
Accumulated rainwater is to be pumped from the 607-1F primary sedimentation tank (rectangular basin) and sludge digestion (circular) tank to the 60…
Sub-recipient will rebuild three miles of access road and install culvert and erosion control material in area where access road under power line i…
Rebuild a 69-kV transmission line, convert 30 segments of distribution lines from overhead to underground, and install OPGW communications infrastr…
This project plans to replace an aging 60kV transmission line with a new 115kV line approximately 7.9 miles in length. In addition to this line, op…
Power lines will be buried at a specific location in the Bay Mart Gas Station. The local electric provider will bury the lines, and local a contrac…
BPA proposes to provide funding to the Nez Perce Tribe to realign the outlet of Indian Grave Creek where it enters the Lochsa River to enhance fish…
Plan development of the River Parish Sequestration Project, a CO2 transportation and storage solution, and site characterization. Conduct a pipelin…
Bonneville Power Administration (BPA) proposes to fund the Columbia River Estuary Study Taskforce (CREST) to implement a channel reconnection proje…
BPA proposes to enter into agreements to provide power to serve six of BPA’s customer electric utilities in Southeast Idaho.…