Install emergency lighting in 772-7B.…
An effort is being made to remove all nuclear safety blanks (NSBs) in H Canyon and installing blind flanges to create an air gap. An air gap provid…
Install the ADA technology at the Orsted Ford Ridge wind farm. The system will be designed to integrate with the plant's SCADA operational (OT) net…
BEA is performing additional Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 and/or 2 on behalf of the U.S. Department of Energy (DOE). Th…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Racine (City), WI to develop, design, and install a solar photovoltaic (PV) carport system at the City's Bus Garage, incorporate energy efficiency upgrades, including advanced building control systems and installing light emitting diodes (LED) at multiple locations, and install energy conservation measures (EBCx), conduct existing building commissioning, and implement building performance design solutions at multiple locations.
WAPA is finishing the rebuild of Great Falls to Verona 161 kV. The rebuild will use 230 kV wood and Glued Laminated structures and add OPGW. Ther…
Bonneville Power Administration (BPA) proposes to perform soil sampling and geotechnical investigations to inform design details for potential site…
The MAGIS-100 experiment will be installed within the MINOS service building shaft. This project is to relocate existing infrastructure utilities t…
The Fermilab Technology Development Project aims to design, build, and operate an electron accelerator that meets the requirements specified by the…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes toconduct routine vegetation management along its North Gunnison - …