Replace gutters at 713-N.…
L-Area Fuel Point Closure at 715-L. Provide labor, materials, and services to permanently close the L-Area Fuel Station. Closure must comply with r…
Replace HVAC unit at 713-N Tool Room.…
Install new level transmitters for tank cells A, B, C and D to provide level monitoring and communicate back to the remote level monitoring system.…
Renovations to be performed in various offices in 735-B and 735-4B. Windows that are leaking will be repaired and sealed. Sheetrock will be patched…
This activity is to replace the 151-1C and 151-2C DC breaker panels due to age and normal wear over time. Note: Revision 1 is necessary to extend o…
In July 2025, WAPA completed CX Determination on acquisition of 2.07 acres of additional land abutting the north and east perimeter of Wessington S…
RP No. 1 - District Substation will be converted from a 46 kV to a 161 kV substation by replacing outdated attributes. RP No. 2- install a new 1.8 …
Project work involves converting existing overhead distribution lines to underground transmission, installation of detection equipment (sensors, ca…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and Access for Marine Energy Research (TEAMER) program.