The U.S. Department of Energy Office of Legacy Management (LM) owns and manages an extraction and monitoring well network adjacent to the Shiprock,…
Collecting 20-miles across 4-lines of 2-D surface seismic data.…
This project will include vegetation management in the right of ways (ROW) identified in the map provided and in 69.77 miles of ROW. The work will …
Mason PUD 3 is upgrading it's Pioneer Substation from a 25 MVA unit to a 40 MVA unit along with new relay panels that will allow higher electric lo…
Bradford Township replacement of existing Electric Substation facility will include excavation of a grounding grid, poured cement piers for substat…
The project objective is to develop a system engineering approach for produced water resource extraction and management in oil and gas operations.…
Installation of electronic reclosers. The majority will be installed on existing poles within rights-of-way while some instances of new poles withi…
The U.S. Department of Energy (DOE) proposes to exercise a five-year lease extension option (October 1, 2025 to September 30, 2030) for approximate…
The U.S. Department of Energy (DOE) proposes to lease approximately 25,000 square feet of office and warehouse/assembly space nearby to the LBNL ca…
Commonwealth LNG, LLC (Commonwealth) filed an application (Application) with the Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM) (formerly the Office of Fossil Energy) on October 16, 2019.