NuScale SMR Design Development and Certification Project CX(s) Applied: B3.6 Date: 01/22/2014 Location(s): Idaho Offices(s): Idaho Operations Office
Big George-Heart Mountain 69 Kilovolt Transmission Line Glendale Tap Replacement, Park County, Wyoming CX(s) Applied: B4.6 Date: 01/21/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Collider Detector at Fermilab Repurposing CX(s) Applied: B1.15, B2.1 Date: 01/21/2014 Location(s): Illinois Offices(s): Fermi Site Office
Beaver Creek-Sterling 115 Kilovolt Transmission Line Structure Relocation, Morgan County, Colorado CX(s) Applied: B4.13 Date: 01/21/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Blythe-Knob 161 Kilovolt Transmission Line, Structure Maintenance Project CX(s) Applied: B1.3 Date: 01/21/2014 Location(s): California, California Offices(s): Western Area Power Administration-Desert Southwest Region
Accelerating the Deployment of Energy Efficiency and Renewable Energy Technologies in South Africa CX(s) Applied: A9, A11 Date: 01/21/2014 Location(s): CX: none Offices(s): Golden Field Office
Franklin to Hatwai Fiber Project CX(s) Applied: B4.7 Date: 01/17/2014 Location(s): Washington, Washington, Washington, Idaho Offices(s): Bonneville Power Administration
Haverhill Citizens Center Energy Efficiency Improvements CX(s) Applied: B1.23, B5.1 Date: 01/16/2014 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
Ross Communication Tower Fiber Installation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Lightspeed Network's Fiber Installation near Pilot Butte Substation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Oregon Offices(s): Bonneville Power Administration