Archer-Cheyenne North/South 115 Kilovolt Transmission Line Structure Replacement, Laramie County, Wyoming CX(s) Applied: B4.13 Date: 01/28/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Carbon Dioxide Capture By Cold Membrane Operation with Actual Coal-Fired Power Plant Flue Gas CX(s) Applied: A1, A9, B3.6, B5.5 Date: 01/28/2014 Location(s): CX: none, Delaware, Alabama, Pennsylvania, California Offices(s): National Energy Technology ...
Building 26 FSARS CX(s) Applied: B1.3, Facility operation and maintenance Date: 01/28/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
South Louisiana EOR/Sequestration Research and Development Project CX(s) Applied: A1, A9, A11, B3.6 Date: 01/28/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
South Louisiana EOR/Sequestration Research and Development Project CX(s) Applied: A1, A9, A11, B3.6 Date: 01/28/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
Replace Bayou Choctaw 16” B-Spec Crude Oil Header Piping CX(s) Applied: B1.3 Date: 01/27/2014 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Transformational GaN Substrate Technology CX(s) Applied: B3.6Date: 01/27/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Low-Cost Gallium Nitride Vertical Transistor CX(s) Applied: B3.6Date: 01/27/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
High-Quality, Low-Cost GaN Single Crystal Substrates for High-Power Devices CX(s) Applied: B3.6Date: 01/27/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Subcontractor Repair of Roof Leaks at 245-10F CX(s) Applied: B1.3 Date: 01/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office