Substation Maintenance and Renovation Activities for 2014 CX(s) Applied: B1.3 Date: 01/23/2014 Location(s): Arizona, California, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Construct Solar Energy Generation Facility CX(s) Applied: B5.16 Date: 01/23/2014 Location(s): Nevada Offices(s): National Energy Technology Laboratory
South-Central Partnership for Energy Efficiency as a Resource (SPEER) Achieving Regional Energy Efficiency Potential in the South-Central U.S. CX(s) Applied: A9 Date: 01/22/2014 Location(s): Texas Offices(s): Golden Field Office
Extension and dissemination of the Open Modeling Framework and GridLAB-D CX(s) Applied: A1, A9, A11 Date: 01/22/2014 Location(s): Virginia Offices(s): National Energy Technology Laboratory
Midwest Regional Carbon Sequestration Partnership Phase III - Subtask 1.7 CX(s) Applied: B3.1, B3.7 Date: 01/22/2014 Location(s): Ohio Offices(s): National Energy Technology Laboratory
St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Enhanced Shielding Performance of High Level Waste Storage Packages via Multi-Component Coatings – Virginia Polytechnic Institute and State University CX(s) Applied: B3.6 Date: 01/22/2014 Location(s): Idaho Offices(s): Idaho Operations Office
Ellensburg-Moxee No. 1 Right-Of-Way (ROW) Geotechnical Exploration Between Structures 17/1-22/2 CX(s) Applied: B4.7 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
NuScale SMR Design Development and Certification Project CX(s) Applied: B3.6 Date: 01/22/2014 Location(s): Idaho Offices(s): Idaho Operations Office
Big George-Heart Mountain 69 Kilovolt Transmission Line Glendale Tap Replacement, Park County, Wyoming CX(s) Applied: B4.6 Date: 01/21/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region