Ultra Efficient CHHP using High Temperature Fuel Cell CX(s) Applied: A9, B3.6 Date: 02/06/2014 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
Malin Substation Storm Drain and Switchyard Rock Improvements CX(s) Applied: B1.3 Date: 02/06/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Henderson 230 Kilovolt Switchyard (Erosion Control) CX(s) Applied: B1.3 Date: 02/06/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
High-Power Vertical-Junction Field-Effect Transistors Fabricated on Low-Dislocation-Density GaN by Epitaxial Lift-Off CX(s) Applied: B3.6Date: 02/04/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Niobium Tin Superconducting Coil Development for Future Magnets CX(s) Applied: B1.15, B1.31 Date: 02/04/2014 Location(s): Illinois Offices(s): Fermi Site Office
A Geomechanical Model for Gas Shales Based on Integration of Stress CX(s) Applied: A9 Date: 02/03/2014 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Advanced Analytical Methods for Air and Stray Gas Emissions and Produced Brine Characterization CX(s) Applied: A9, A11, B3.1 Date: 02/03/2014 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Analytical Physics - Transmission Electron Microscopy (TEM) CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Analytical Physics - Thermal Analysis CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Advanced Manufacturing and Performance Enhancements for Reduced Cost Silicon Carbide MOSFETS CX(s) Applied: B3.6Date: 01/30/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy