Washington River Protection Solutions LLC - Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Methane to Methanol Fuel: A Low Temperature Process CX(s) Applied: B3.6Date: 12/13/2012 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Widen F-Area Inner Loop Road CX(s) Applied: B1.32 Date: 12/13/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Novel Photon Management for Thin-Film Photovoltaics CX(s) Applied: A9, B3.6 Date: 12/13/2012 Location(s): Utah Offices(s): Golden Field Office
Sologen Geothermal Co-Production Field Demonstration CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15 Date: 12/13/2012 Location(s): Texas Offices(s): Golden Field Office
Advancement of the Kinetic Hydropower System (KHPS) to DOE TRL 7/8 CX(s) Applied: A9, B3.6, B3.16 Date: 12/13/2012 Location(s): New York Offices(s): Golden Field Office
American Recovery and Reinvestment Act Energized Missouri Water Loan Project at City of Maryville CX(s) Applied: B5.1, B5.2 Date: 12/13/2012 Location(s): Missouri Offices(s): Golden Field Office
Innovation Realization: Building and Supporting an Advanced Contract Manufacturing Cluster in Southeast Michigan CX(s) Applied: A9, B3.6 Date: 12/13/2012 Location(s): Michigan Offices(s): Golden Field Office
Light-Duty Fuel Cell Electric Vehicle Validation Data CX(s) Applied: A9 Date: 12/13/2012 Location(s): California Offices(s): Golden Field Office
Ault Substation Drainage Swale Construction CX(s) Applied: B4.6 Date: 12/13/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region