CH2MHill Plateau Remediation Company - Outdoor tests and Experiments on Materials and Equipment Components, December 2012 to December 2013 CX(s) Applied: B3.11 Date: 12/12/2012 Location(s): Washington Offices(s): River Protection-Richland Operations O...
Replace Brine Disposal System Header to Bryan Mound Brine Tank, GFE CX(s) Applied: B1.3 Date: 12/11/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Loss of a Major Transformer at Bryan Mound or West Hackberry CX(s) Applied: B1.3 Date: 12/11/2012 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Big Hill Site Building Upgrades, Phase II CX(s) Applied: B1.3 Date: 12/11/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Cathodic Protection Potential Stations at 292-S Diesel Fuel Oil Storage Tanks CX(s) Applied: B2.5 Date: 12/11/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Holyoke Substation Transformer Replacement CX(s) Applied: B4.6 Date: 12/11/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Pacific Marine Energy Center Fiscal Year 2012 Funding CX(s) Applied: A9, A11, B3.6 Date: 12/10/2012 Location(s): Oregon Offices(s): Golden Field Office
A Proposal to Accelerate Innovations in Advanced Manufacturing of Thermal and Environmental Control Systems CX(s) Applied: A9, B3.6 Date: 12/10/2012 Location(s): New York Offices(s): Golden Field Office
Validation of an Advanced High Pressure Proton Energy Systems Electrolyzer and Composite Hydrogen Storage at the SunHydro Stations CX(s) Applied: A9, B5.22 Date: 12/10/2012 Location(s): Connecticut Offices(s): Golden Field Office
Advanced Manufacturing Medical/Biosciences Pipeline for Economic Development CX(s) Applied: A9, B3.6 Date: 12/10/2012 Location(s): California Offices(s): Golden Field Office