Operation of the 50 MeV Electron Linac Accelerator CX(s) Applied: B3.10Date: 01/12/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Office of NEPA Policy and Compliance
January 12, 2015Operation of the 50 MeV Electron Linac Accelerator
CX(s) Applied: B3.10
Date: 01/12/2015
Location(s): Illinois
Offices(s): Argonne Site Office
This review covers the operation and maintenance of the 50-MeV Linac electron accelerator as it is currently authorized. The accelerator will be operated within approved and authorized limits as detailed in the governing Safety Assessment Document, Work Planning and Control documentation, Radioactive Work Permit, or other applicable documents.