Novel Sorbent to Cleanup Biogas for Combined Heat and Power Systems CX(s) Applied: B3.6 Date: 12/19/2012 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
Novel Sorbent to Cleanup Biogas for Combined Heat and Power Systems CX(s) Applied: B3.6, B5.15 Date: 12/19/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration
Analytical Support For Unpolished Plutonium Oxide Production (UPOP) Campaign CX(s) Applied: B3.6 Date: 12/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of a Ballymore Ladder at Sampling Location 4MC-002F CX(s) Applied: B2.3 Date: 12/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Negating Energy Losses in Organic Photovoltaics Using Photonic Structures CX(s) Applied: B3.6Date: 12/18/2012 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
High Energy Storage Capacity Low-Cost Iron Flow Battery CX(s) Applied: B3.6Date: 12/18/2012 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Repair and Line Bryan Mound Brine Tank, BMT-1 CX(s) Applied: B1.3 Date: 12/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Washington River Protection Solutions LLC - Workplace Enhancements CX(s) Applied: B2.1 Date: 12/18/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
288-F Ash Basin Landfill Closure CX(s) Applied: B6.1 Date: 12/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office