HB-Line Security Upgrades CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Telephone Line Removal Along the Access Road into Wautoma Substation CX(s) Applied: B1.3 Date: 03/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Novel Electrolytes Via Compressed Gas Solvent for Higher Voltage CX(s) Applied: B3.6Date: 03/14/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Testing of Irradiated MAX Phase Materials CX(s) Applied: B3.6 Date: 03/13/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Big Hill Anhydrite Pond Sampling and Analysis CX(s) Applied: B3.1 Date: 09/23/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Heating Ventilation and Air Conditioning Unit for Room D-007 in 735-A CX(s) Applied: B1.3 Date: 03/11/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Portable Sanitation Station in the Effluent Treatment Project CX(s) Applied: B1.15 Date: 03/11/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 709-1G CX(s) Applied: B1.3 Date: 03/11/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 730-1B CX(s) Applied: B1.3 Date: 03/11/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
2H Evaporator Scale Dissolution Studies CX(s) Applied: B3.6 Date: 03/10/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office