Novel Ceramic Membranes for the Efficient Utilization of Natural Gas CX(s) Applied: B3.6 Date: 04/02/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute CX(s) Applied: B4.13 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Cowlitz Falls Fish Facility Access Agreement Extension CX(s) Applied: A2 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Integrated Study Using Geology, Geophysics, Reservoir Models, and Rock Mechanics CX(s) Applied: A9, B3.6 Date: 04/02/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Vapor Space Corrosion Testing of Carbon Steel CX(s) Applied: B3.6 Date: 04/02/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Integrated Study Using Geology, Geophysics, Reservoir Models, and Rock Mechanics CX(s) Applied: A9, A11, B3.11 Date: 04/02/2014 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
S8G Prototype Refueling Overhaul CX(s) Applied: B1.3, B1.5, B1.7, B1.14, B1.30, B1.31, B2.1, B2.4, B2.5, B6.3 Date: 04/01/2014 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Emergency Installation of Concrete Pad for Western's Communication Tower at Valley Farms Substation CX(s) Applied: B4.6 Date: 04/01/2014 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Project 1612B Removal and Disposal of Polychlorinated Biphenyls Contaminated Equipment CX(s) Applied: B1.17 Date: 04/01/2014 Location(s): Missouri Offices(s): Kansas City Site Office
Liberty Substation - Vegetation Management CX(s) Applied: B1.3 Date: 04/01/2014 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region