Repainting 192-4K Firewater Storage Tank CX(s) Applied: B1.3Date: 02/19/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 705-K CX(s) Applied: B1.3Date: 02/19/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace 735-A Process Water Heater CX(s) Applied: B1.3Date: 02/19/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 773-43A CX(s) Applied: B1.3Date: 02/19/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Chromatography/mass Spectrometry CX(s) Applied: B3.6Date: 02/19/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Evaluating the Techno-economic Feasibility of Forward Osmosis Processes Utilizing Low Grade Heat... CX(s) Applied: A9Date: 41878 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Bond Strength Laser Shock Testing CX(s) Applied: B1.31Date: 02/18/2015 Location(s): IdahoOffices(s): Nuclear Energy
A 12 Volt Start-Stop Lithium Polymer Battery Pack CX(s) Applied: B3.6Date: 02/18/2015 Location(s): MichiganOffices(s): National Energy Technology Laboratory
Pueblo Canyon Grade Control Structure Revitalization and Wetlands Stabilization, TA-74 CX(s) Applied: B1.3, B1.11, B1.13, B3.1, B6.1Date: 02/18/2015 Location(s): New MexicoOffices(s): Los Alamos Site Office
Record of Categorical Exclusion Determination to Replace Piping Header at Bryan Mound RWIS and RWIP (BM-MM-1027) CX(s) Applied: B1.3Date: 02/18/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office