Building 4 Drain Line Replacement CX(s) Applied: B1.3, B1.15, B1.31 Date: 01/08/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Production of Coal/Biomass-to-Liquid-Based Jet Fuels from Biomass-Based Feedstocks CX(s) Applied: B3.6 Date: 01/08/2013 Location(s): North Dakota Offices(s): National Energy Technology Laboratory
Wave Energy Technology- New Zealand Multi-Mode Wave Energy Converter Advancement Project CX(s) Applied: A9 Date: 01/08/2013 Location(s): Hawaii, Oregon Offices(s): Golden Field Office
Detachment Faulting and Geothermal Resources - An Innovative Integrated Geological and Geophysical Investigation of Pearl Hot Spring, Nevada CX(s) Applied: A9, B3.1, B3.6 Date: 01/08/2013 Location(s): Nevada Offices(s): Golden Field Office
Pt-based Bi-metallic Monolith Catalysts for Partial Upgrading of Microalgae Oil CX(s) Applied: A9, B3.6 Date: 01/08/2013 Location(s): New Jersey Offices(s): Golden Field Office
Project Icebreaker CX(s) Applied: A9, B3.1 Date: 01/07/2013 Location(s): Ohio Offices(s): Golden Field Office
Technology Research, Development and Tools for Clean Biomass Cookstoves CX(s) Applied: A9, B3.6, B5.15 Date: 01/07/2013 Location(s): New York, California, Colorado Offices(s): Golden Field Office
University of Illinois Urbana-Champaign- Cyber-Physical Modeling and Analysis for a Smart and Resilient Grid CX(s) Applied: B3.6 Date: 01/07/2013 Location(s): Illinois, Florida, Illinois Offices(s): Advanced Research Projects Agency-Energy
Minnesota Chippewa Tribe, Minnesota Energy Efficiency and Conservation Block Grant CX(s) Applied: A9, B5.1, B5.16 Date: 01/07/2013 Location(s): Minnesota Offices(s): Golden Field Office