Refinery Upgrading of Hydropyrolysis Oil from Biomass CX(s) Applied: A9, B3.6 Date: 01/07/2013 Location(s): Illinois Offices(s): Golden Field Office
Video Inspection of Bryan Mound 36-inch Raw Water Pipeline CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Beck Road Substation Meter Installation CX(s) Applied: B1.7 Date: 01/07/2013 Location(s): Idaho Offices(s): Bonneville Power Administration
Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration
LanzaTech Inc. - Process Intensification of Biological Natural Gas Conversion through Novel Bioreactors Designs CX(s) Applied: B3.6 Date: 01/06/2014 Location(s): Georgia, Illinois, Louisiana, New York, Michigan Offices(s): Advanced Research Projects A...
Maintenance and Wood Pole Replacement along the Gila Wellton Mohawk 161 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 01/03/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Synthetic Gene Circuits to Enhance Production of Transgenic Bioenergy Crops CX(s) Applied: B3.6Date: 01/03/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Pacific Northwest National Laboratory- Non-Wire Methods for Transmission Congestion Management Through Predictive Simulation and Optimization CX(s) Applied: B3.6 Date: 01/03/2013 Location(s): Washington, North Carolina, Illinois, Oregon Offices(s): Ad...
Strategic Petroleum Reserve Site Subsidence Surveys, 2013-2017 CX(s) Applied: B3.1 Date: 01/02/2013 Location(s): Louisiana, Texas, Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Simplified Predictive Models for Carbon Dioxide Sequestration Performance Assessment CX(s) Applied: A9 Date: 08/15/2012 Location(s): Ohio, California Offices(s): National Energy Technology Laboratory