Western's Power Marketing Operations Center New Fiber Optic Cable Installation CX(s) Applied: B1.31, B2.2, B4.7 Date: 01/16/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Lusk Rural Substation Control Building Construction CX(s) Applied: B1.3 Date: 01/16/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Development of High-Performance Gallium Nitride Transistors CX(s) Applied: B3.6Date: 01/15/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Deactivation and Decommissioning of Soil Vapor Extraction Units CX(s) Applied: B1.23 Date: 01/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Savannah River National Laboratory Electrolyzer 30 weight % Sulfuric Acid pH Adjustment CX(s) Applied: B3.6 Date: 01/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Separation of the Minor Actinides from the Lanthanides with Magnetic Fields CX(s) Applied: B3.6 Date: 01/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Innovations in Advanced Materials and Metals (IAM2) CX(s) Applied: A9, A11 Date: 01/15/2013 Location(s): Washington Offices(s): Golden Field Office
Stabilization of Bio-Oil Fractions for Insertion into Petroleum Refineries CX(s) Applied: A9, B3.6 Date: 01/15/2013 Location(s): Iowa, Oklahoma, Washington Offices(s): Golden Field Office
Optimized Co-Processing of Algal Bio-Crude through a Petroleum Refinery CX(s) Applied: A9, B3.6, B5.15 Date: 01/15/2013 Location(s): California, New Mexico Offices(s): Golden Field Office
Cost-Effective Treatment of Flowback and Produced Water via an Integrated Precipitative Supercritical Process CX(s) Applied: A9, A11, B3.6 Date: 01/15/2013 Location(s): Ohio Offices(s): National Energy Technology Laboratory