CX-013453: Categorical Exclusion Determination

Pueblo Canyon Grade Control Structure Revitalization and Wetlands Stabilization, TA-74 CX(s) Applied: B1.3, B1.11, B1.13, B3.1, B6.1Date: 02/18/2015 Location(s): New MexicoOffices(s): Los Alamos Site Office

Office of NEPA Policy and Compliance

February 18, 2015
Estimated Read Time   min

Pueblo Canyon Grade Control Structure Revitalization and Wetlands Stabilization, TA-74
CX(s) Applied: B1.3, B1.11, B1.13, B3.1, B6.1
Date: 02/18/2015 
Location(s): New Mexico
Offices(s): Los Alamos Site Office

The proposed Grade Control Structure Revitalization and Wetlands Stabilization project activities will repair flood damage, ensure continued operation of a gage station, provide safer access for ongoing maintenance activities and minimize stream bank erosion along the New Mexico Department of Transportation right-of-way. The proposed work will stabilize the Pueblo Canyon wetlands area and assist in floodplain development.

Document(s) Available for Download