Disconnect Switch Stand Grounding Upgrades - Spokane District CX(s) Applied: B4.6Date: 02/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
February 6, 2015Disconnect Switch Stand Grounding Upgrades - Spokane District
CX(s) Applied: B4.6
Date: 02/06/2015
Location(s): Washington
Offices(s): Bonneville Power Administration
The Bonneville Power Administration (BPA) proposes to upgrade grounding at several disconnect switch stand locations located in the Spokane District. Grounding upgrades are necessary to increase employee safety when manually operating the disconnect switches.