772-F Low-Activity Drain (LAD) Discharge Header Modification CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Chevron U.S.A. Inc. CX(s) Applied: B5.7 Date: 11/29/2012 Location(s): Louisiana, California Offices(s): Office of Oil and Natural Gas
Dismantle and Remove (D&R) and Replace 773-A D-Wing Air Handling and Condensing Units CX(s) Applied: B1.3 Date: 05/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Spring Creek – Wine County No. 1 Transmission Tower Relocation CX(s) Applied: B4.6 Date: 11/29/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration
Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 CX(s) Applied: B2.5 Date: 11/29/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Refurbish 607-53C Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Development of Optimal Catalyst Designs and Operating Strategies for Lean Nitrous Oxide Reduction CX(s) Applied: B3.6 Date: 11/28/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Central Vermont Recovered Biomass Facility CX(s) Applied: B5.20 Date: 11/28/2012 Location(s): Vermont Offices(s): Golden Field Office
Recovery Act: Advanced Seismic Data Analysis Program ('Hot Pot Project') CX(s) Applied: A9, B3.1 Date: 11/28/2012 Location(s): CX: none Offices(s): Golden Field Office