Novel Geothermal Development of Deep Sedimentary Systems in the United States CX(s) Applied: A9, B3.6 Date: 01/02/2014 Location(s): Utah Offices(s): Golden Field Office
Tonto Apache Community Clean Energy Project CX(s) Applied: A9, B5.1, B5.16 Date: 01/02/2014 Location(s): Arizona Offices(s): Golden Field Office
Happy Jack 230 Kilovolt Substation Fiber Optic Installation in Laramie County, Wyoming CX(s) Applied: B4.7 Date: 12/31/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Green Mountain-Blue Ridge Repeater 2.4 Kilovolt Distribution Line Danger Tree Management in Grand County, Colorado CX(s) Applied: B1.3 Date: 12/31/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Gore Pass-Muddy Pass 69 Kilovolt Transmission Line Danger Tree Management in Grand and Jackson Counties, Colorado CX(s) Applied: B1.3 Date: 12/31/2013 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Repair Corroded Flow Line Near 33-SX-11 CX(s) Applied: B5.4, B5.6 Date: 12/30/2013 Location(s): Wyoming Offices(s): RMOTC
Pioneering High Energy Nuclear Interaction Experiment Fast Time of Flight Detector Testing CX(s) Applied: B3.6 Date: 12/30/2013 Location(s): Illinois Offices(s): Fermi Site Office
Revenue Meter Installation at Wind River Biomass Facility CX(s) Applied: B1.7 Date: 12/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Assisting the Tooling and Machining Industry to Become Energy Efficient CX(s) Applied: A9, B5.1 Date: 12/19/2013 Location(s): Arizona Offices(s): Golden Field Office
Lightning Mapping Array Project CX(s) Applied: A8, A9, B3.1, B1.24 Date: 12/27/2013 Location(s): Texas Offices(s): Pantex Site Office