Tucson Substation 162/262 Breaker Replacement CX(s) Applied: B3.1, B4.11 Date: 09/05/2012 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
High Power Laser Tool and System for Unique Geothermal Well Completions CX(s) Applied: A9, B3.6 Date: 09/04/2013 Location(s): Colorado, Texas Offices(s): Golden Field Office
Development of Manufacturing Technology to Accelerate Cost Reduction of Low Concentration Photovoltaic Modules CX(s) Applied: A9, B1.31, B3.6 Date: 09/04/2013 Location(s): California Offices(s): Golden Field Office
Support for the NETL's Waste Treatment and Immobilization Plant Project CX(s) Applied: A1, A9, A11 Date: 09/04/2013 Location(s): CX: none Offices(s): National Energy Technology Laboratory
Energy Efficiency and Conservation Block Grant - City of Houston, Texas CX(s) Applied: B5.1 Date: 09/04/2013 Location(s): Texas Offices(s): Golden Field Office
Weatherization Training, Technical Assistance, and Information Dissemination CX(s) Applied: A9, A11 Date: 09/03/2013 Location(s): CX: none Offices(s): Golden Field Office
Weatherization Leveraged Partnerships Development Project CX(s) Applied: A9, A11 Date: 09/03/2013 Location(s): CX: none Offices(s): Golden Field Office
Subcontractor Repair of Roof at 704-1N CX(s) Applied: B1.3 Date: 09/03/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Low-cost, Highly Transparent Flexible Low-e Coating Film to Enable Electrochromic Windows with Increased Energy Savings CX(s) Applied: A9, B3.6 Date: 09/03/2013 Location(s): Colorado Offices(s): Golden Field Office
Adams Tap Motor-Operator Interrupters and Control Building Replacement CX(s) Applied: B4.6 Date: 09/11/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region