Storm Water Control Measures at Individual Permit Site, TA-72 CX(s) Applied: B1.33, B6.1 Date: 11/14/2012 Location(s): New Mexico Offices(s): Los Alamos Site Office
A Lightweight, Direct Drive, Fully Superconducting Generator for Large Wind Turbines CX(s) Applied: B3.6 Date: 11/14/2012 Location(s): Florida Offices(s): Golden Field Office
Storm Water Control Measures at Individual Permit Site, TA-72 CX(s) Applied: B1.33, B6.1 Date: 11/14/2012 Location(s): New Mexico Offices(s): Los Alamos Site Office
Solar Parks Project CX(s) Applied: B5.16 Date: 11/09/2012 Location(s): Florida Offices(s): Golden Field Office
Alterations to Existing Buildings Construction of Small-Scale Support Structures and Relocation of Machinery and Equipment CX(s) Applied: B1.11; B1.15; B1.31 Date: 11/09/2012 Location(s): Tennessee, California, Virginia Offices(s): Berkeley Site Office
Spent Fuel Dry Storage Pilot Projects CX(s) Applied: B3.6 Date: 11/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Y646 (Y189), Renovation of E-Wing Ventilation, Building 773-A CX(s) Applied: B2.1 Date: 11/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Collaborative Atomic-Scale Design, Analysis, and Nanofabrication for Record Breaking, Single-Crystal Solar Cell Arrays CX(s) Applied: A9, B3.6 Date: 11/09/2012 Location(s): Texas Offices(s): Golden Field Office
Vapor Transport Deposition for Thin Film III-V Photovoltaics CX(s) Applied: A9, B3.6 Date: 11/09/2012 Location(s): CX: none Offices(s): Golden Field Office
Brigham City Hydro Generation Project CX(s) Applied: B1.8, B5.2 Date: 11/08/2012 Location(s): Utah Offices(s): Golden Field Office