Magnetic Pulser CX(s) Applied: None applied. Date: 10/30/2012 Location(s): Missouri Offices(s): Kansas City Site Office
Electron Beam Melting CX(s) Applied: None applied. Date: 10/30/2012 Location(s): Missouri Offices(s): Kansas City Site Office
Closure of Above ground Hazardous Waste Storage Tank CX(s) Applied: B6.1 Date: 10/30/2012 Location(s): Missouri Offices(s): Kansas City Site Office
Relay and Switchboard Panel Replacements CX(s) Applied: B4.6 Date: 10/29/2012 Location(s): Arkansas Offices(s): Southwestern Power Administration
Artesia-Rangely Tap of the Hayden-Vernal 138 Kilovolt Transmission Line Bank Stabilization on Structure 20/2 CX(s) Applied: B1.3 Date: 10/29/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Preparation and Temperature-Time Settling Treatment of Rheology Samples CX(s) Applied: B3.6 Date: 10/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
California State Los Angeles University Auxiliary Services Hydrogen Refueling Facility Performance Evaluation and Optimization CX(s) Applied: A9, B5.22 Date: 10/24/2012 Location(s): California Offices(s): Golden Field Office
Office of Secure Transportation—Building 9714 Extension of Concrete Apron CX(s) Applied: B1.3 Date: 10/24/2012 Location(s): Tennessee Offices(s): Oak Ridge Office
Routine Operating and Administrative Activities (ROAA) CX(s) Applied: A8, A9, A11, B1.3, B1.23, B1.31 Date: 10/24/2012 Location(s): Missouri Offices(s): Kansas City Site Office
Malin Substation Relay Equipment Replacements CX(s) Applied: B1.7 Date: 10/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration