Novel Electro-Deoxygenation Process for Bio-oil Upgrading CX(s) Applied: A9, B5.15 Date: 08/26/2013 Location(s): Utah Offices(s): Golden Field Office
Emergency Storm Damage Repairs to the Gila North Gila, Gila Knob, and Sonora San Luis Transmission Lines, near Yuma, Yuma County, Arizona CX(s) Applied: B4.6 Date: 08/26/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert So...
Alberton Communication Site Construction CX(s) Applied: B1.19 Date: 08/26/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Naselle Ridge Emergency Generator Replacement CX(s) Applied: B4.6 Date: 08/26/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Willow Creek Building Pedestrian Bridge Replacement CX(s) Applied: B2.5 Date: 08/25/2009 Location(s): Idaho Offices(s): Idaho Operations Office
Rapid Prototyping Machines Support Research and Development CX(s) Applied: B3.6 Date: 08/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Predictive Large Eddy Simulation (LES) Modeling and Validation for High-Pressure Turbulent Flames and Flashback in Hydrogen-Enriched Gas Turbine CX(s) Applied: A9, B3.6 Date: 08/23/2013 Location(s): Texas Offices(s): National Energy Technology Laborat...
Technology Integration Program CX(s) Applied: A9, A11 Date: 08/23/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Technology Integration Program CX(s) Applied: A9, B3.6 Date: 08/23/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
University of California Berkeley--Developing Metal-Organic Frameworks as Adsorbents for Industrial Carbon Capture Application CX(s) Applied: B3.6 Date: 08/23/2013 Location(s): California, Colorado, California Offices(s): Advanced Research Projects Ag...