Research and Development of Coaxial Cable Sensors for Use in Subsurface Environments CX(s) Applied: A9, B3.6 Date: 11/02/2012 Location(s): Missouri Offices(s): National Energy Technology Laboratory
Activity-Specific Categorical Exclusion for the Transfer of 712 Complex Buildings and Land CX(s) Applied: B1.24 Date: 11/02/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Install 200 Kilowatt Solar Photovoltaic System and Routine Maintenance Actions CX(s) Applied: B1.3, B1.19, B5.16 Date: 11/02/2012 Location(s): Arizona Offices(s): Legacy Management
Tucannon River Substation Expansion Project CX(s) Applied: B4.6 Date: 11/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Analysis of Solutions by Ion Chromatography CX(s) Applied: B3.6 Date: 11/01/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Engineering Development Laboratory SO2 Depolarized Electrolyzer Test Facility Operation CX(s) Applied: B3.6 Date: 11/01/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Next Generation Solvent (NGS) Real Waste Testing CX(s) Applied: B3.6 Date: 11/01/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Development and Test of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon CX(s) Applied: A9, B3.1 Date: 11/01/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Development and Test of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon CX(s) Applied: A9, B3.1 Date: 11/01/2012 Location(s): California Offices(s): National Energy Technology Laboratory
CH2MHill Plateau Remediation Company - Small-scale Research and Development, Laboratory Operations, and Pilot Projects CX(s) Applied: B3.6 Date: 11/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office