Smart and Calibrated Pig Surveys of Strategic Petroleum Reserve Raw Water/Crude Oil Pipelines CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Longview-Chehalis No. 1 and No. 3, and Lexington-Longview No. 1 Access Roads Maintenance CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Security Upgrade Project CX(s) Applied: B1.3, B1.11 Date: 08/22/2012 Location(s): Tennessee Offices(s): Y-12 Site Office
Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Faith-Based Institutional Demonstration and Crowdsource Funding CX(s) Applied: A9, A11, B5.1 Date: 08/21/2013 Location(s): New York Offices(s): Golden Field Office
A Geomechanical Model for Gas Shales Based on Integration of Stress CX(s) Applied: A9, A11, B3.6 Date: 08/21/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Replace River Water Pelton Valves and Remove Existing Valve Houses CX(s) Applied: B1.3. Date: 08/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Leaks over Rooms 12, 15, Hallway at 772-25B CX(s) Applied: B1.3 Date: 08/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Cleaning of the L4 Pump House Galley, Trash Rack, Concrete Inlet Channel and Settling Tank CX(s) Applied: B1.3, B1.5 Date: 08/21/2003 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Advanced Analytical Methods for Air and Stray Gas Emissions and Produced Brine Characterization CX(s) Applied: A9, A11, B3.6 Date: 08/21/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory