Development of On-Site Tapered Spiral Welding for Large Turbine Towers Award Number: DE-EE0006736 CX(s) Applied: A9 Date: 09/09/2014 Location(s): MA Office(s): Golden Field Office
Office of NEPA Policy and Compliance
September 9, 2014Development of On-Site Tapered Spiral Welding for Large Turbine Towers
Award Number: DE-EE0006736
CX(s) Applied: A9
Date: 09/09/2014
Location(s): MA
Office(s): Golden Field Office
The U.S. Department of Energy (DOE) is proposing to provide funding to Keystone Tower Systems to complete the design and certification of a 140 meters (m) spiral-welded tower for a 3 Mega-Watt (MW) class wind turbine and the mobile fabrication facility needed to construct this tower.