Categorical Exclusion (CX) Determinations By Date

Energy Efficient, High Productivity Aluminum Electrolytic Cell with Integrated Power Modulation and Heat Recovery CX(s) Applied: B3.6Date: 12/18/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Zonal Isolation Improvements for Horizontal Wells Drilled in the Marcellus Shale CX(s) Applied: A9, A11, B3.6, B3.11 Date: 12/18/2013 Location(s): Pennsylvania, Pennsylvania, Pennsylvania Offices(s): National Energy Technology Laboratory
Using Multiple In Situ Approaches to Assess Fish Communities and their Connectivity in the Vicinity of Natural Rocky Outcrops and an Adjacent Active Wave Energy Conversion Site in the Pacific Northwest CX(s) Applied: A9, B3.3 Date: 12/18/2013 Location...
Parker-Gila 161 Kilovolt Transmission Line - Structure 109-8 Relocation CX(s) Applied: B1.3 Date: 12/18/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Davis-Parker 230 Kilovolt Transmission Line- Marker Ball(s) Replacement CX(s) Applied: B1.3 Date: 12/17/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
University of Colorado - Carbothermal Reduction Process for Producing Magnesium Metal Using a Reduced Pressure Hybrid Solar/Electric Reactor CX(s) Applied: B3.6 Date: 12/17/2013 Location(s): Colorado Offices(s): Advanced Research Projects Agency-Energy
Pacific Northwest National Laboratory - Catalyzed Organo-Metathetical Process for Magnesium Production from Seawater CX(s) Applied: B3.6 Date: 12/17/2013 Location(s): Washington, Arizona, Utah Offices(s): Advanced Research Projects Agency-Energy