It has been identified as containing asbestos, and it needs to be removed and replaced.…
The Bettersize S3 Plus Particle Image and Size Analyzer will be installed in 999-2W lab 154 in order to provide particle size and shape analysis fo…
Remove the undercoating and replace with galvanized carbon steel sheets.…
Tearing down existing cubicles and replacing with new ones.
Consolidate racks in the data center and enclose with a clear partition.…
Administrative and project management activities. Computer modeling, analysis, engineering, and design. Laboratory testing. Prototype heater tool c…
Contract Management Inc. will provide sidewalk repairs at 737-A, SREL.…
Cover hole in wall with metal plate in corridor 1001 in 235-F.…
Subcontractor will provide roof repairs at 623-30G.…
Subcontractor will provide roof repairs at 751-1A.…