Development of a Heavy-Duty Direct-Injection Spark-Ignition Natural Gas Engine…
Perform repairs and safety enhancements on an overhead bridge crane. …
Remediation activities have been completed at several sites within A- and M-Areas.…
Remove building 707-11F and dispose in C and D Landfill.…
Final deactivation and decommissioning (D and D) of multiple D-Area buildings including: 480-3D, 482-2D, 484-1D, 484-2D, 484-4D, 710-16D, 717-3D, a…
Remove the solenoid valve which controls the plant air system regulator.…
The damaged portion(s) of the DW line needs to be located, repaired and/or replaced.…
Subcontractor will provide roof repairs at 731-N.…
Each of the two Work Orders covers the replacement of a Safety Steam Relief Valve.…
This EEC covers various general renovations for buildings 725-N. 725-1N, and 725-2N in Central Shops.…