Renovate Lab C-130 in Building 773-A to provide a modern laboratory space with a large radiohood located in the center of the room.…
This EEC covers the installation and operation of an autoclave, Model SSR-3A-ADVPB in Building 607-17A.…
The proposed activity of this EC comprises two connected actions: • Replace several aging components of the ATR primary coolant system (PCS), and •…
This revision addresses two changes: 1) The categorical exclusion covering this activity was changed from B2.5 "Facility Safety and Environmental I…
Award Number: DE-EE0008902, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): NM, Office(s): Golden Field Office
Award Number: DE-EE0008917, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): UT, Office(s): Golden Field Office
This activity is to prepare and relocate various equipment from the MCA to off-site and on-site recipients.…
Relocate chiller to new location, inside Temporary Construction Opening (TCO) across from B209 inside Building 226-F.…
Proposed activity will reconfigure and remodel 226-2F to support use as a training and operations support facility.…
The subcontractor shall provide all material, labor, supervision, tools, transportation, lodging and test equipment for obtaining pressurized and u…