Remove 8 small hotel unit HVACs, replace with DOAS system or similar via design build.…
Subcontractor will provide roof repairs at Building 246-2H. The Subcontractor will disturb the existing roof while performing these repairs.…
Replace Valves V-36, V-152, V-87 and V-406 on Steam System. Valves V-36, V-87, and V-406 will also include replacement of presumed asbestos contai…
TDA will develop a new sorbent system for post-combustion CO2 capture and conduct lab and bench-scale testing at TDA. Then, they will conduct field…
Unit needs resized/replaced.…
Subcontractor shall furnish paints and thinners to the four SPR sites for a 3 year period (2019-2021). All paints and thinners are to be in one gal…
The Knolls Laboratory Central Computing Facility Long Term Upgrade Project will support the future computing needs of the Naval Reactors Program by…
Award Number: DE-EE0008696 CX(s) Applied: A9, B5.1 Building Technologies Office Location(s): MA Office(s): Golden Field Office
Award Number: DE-EE0008703 CX(s) Applied: A9 Building Technologies Office Location(s): TX Office(s): Golden Field Office
The existing B4 lower roof will be removed and replaced with a new bitumen roofing system. The EIFS will be repaired, resurfaced, and repainted. Ha…