607-70G Remove insulation from process water line in Ditch 1.…
Remove, replace, reinstall MST-TRP-001 (steam trap) associated piping, insulation (non-asbestos), and potentially asbestos containing material (PAC…
Remove two presumed asbestos containing material (PACM) gaskets from Recovery Well 8 to allow for routine maintenance.…
Upgrade 254-5H Diesel Fuel Level/Leak Detection System with a Veeder Root Level/Leak Detection System.…
Award Number: DE-EE0008702 CX(s) Applied: A9, A11 Building Technologies Office Location(s): VA Office(s): Golden Field Office
Award Number: DE-EE0008699 CX(s) Applied: A9 Building Technologies Office Location(s): FL Office(s): Golden Field Office
This project uses high-energy electron beams (E-Beam) to break chemical bonds so that carbon dioxide can be transformed into valuable products such…
Select, synthesize, and characterize tailored solid adsorbents for computational modeling, bi-layer laminated structures development, process simul…
BPA Task Order for Phase O Outreach and Assistance Program for the Office of Science. Small Business Innovation Research/Small Business Technology …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the entrance gate at the Cody Service Center in Park Cou…