Remove existing temporary scaffold-style handrail and replace with a permanent handrail.…
A Storm Water Visual Assessment Sample Holder (a.k.a Kremlin sleeve) is to be installed at outfall S-10A. …
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
At the Scrap Lumber Pile 631-2G a DPT rig will collect soil samples to a depth of 10-ft at 19 locations. At the Ford Building (690-N) 27 hand aug…
Transport, Receipt, and Unloading of Samples from VC Summer. Rev. 2 Added returning samples to glass vials, where the vials will be subsampled usi…
The proposed action is to fully remove the existing roof system on building 292-F, Fan House, down to the existing metal deck and replace it. …
Reroute Domestic Water underground piping around Trailers 704-62S and 704-63S.…
In 108-1L, remove existing instrument air piping valves V-563, V-564, and V-565. Fabricate, hydro test, in-service leak test & install new spool p…
This CX is for the procurement of government property for the LE-2 CD-3C projects. The environmental impacts of the construction of the projects i…
2 HVAC units with excessive service calls past their expected life cycle will be replaced with better up to date equipment.…